If I have a doc, that has been duplicated for multiple projects, and I create a new view of a table in one of those duplicated docs. Is it possible to paste that view into the other duplicated docs so that it is referencing the table of the same name from that doc instead of having to manually re-create that view in each doc?
Hi @Bianca_Adams!
I think that as long as you copy and paste both the original table and the view you should be able to do it
i’ve done it some months ago and it worked, not sure if it keep the reference working with other table if any