Hi,
I just got back from some time off, and realized that Sub Tasks isn’t sync’ed anymore in my doc.
Anyone has a similar issue?
I do use it to get the estimates from sub-tasks summed up on a parent level.
It basically broke my entire doc. Any thoughts?
Hi Adriano,
We recently moved the ability to get sub tasks (and linked issues) into a sync configuration parameter.
These subtasks can get pretty large, and in several cases they were causing sync failures – we therefore decided to move them into an option.
You can see it here:
Hope that helps.
Thanks,
Hari.
PS: I realize that I should have found a better way to communicate this code change in the app; this is my bad. My apologies.
3 Likes
Thanks for the response, found it. I just click on sync, and I’m waiting for it atm.